TOTAL PRODUCTIVE MAINTENANCE ON THE AIRBUS PART MANUFACTURING

Akbar Adhiutama, Rony Darmawan, Aldo Fadhila

Abstract


An Indonesia manufacturing company producing Airbus wing parts experienced losses of more than $100,000 in 2017. The production of A 380 wing parts contributed to 73% of the total losses, and 37% came from parts production of A 350 and A 320. The study focused on the most significant contribution losses of A 380 wing parts that is Drive Rib 1.  This paper aims at examining the root cause of the loss in A 380-Program, solving the root cause by proposing the alternative solution, and improving the performance in A 380 Program. By conducting the interview and archival data, the data were analyzed employing Root Cause Analysis (RCA) to discover the root cause of problems. Low reliability of the production machine (DGAL Cincinnati Milacron) was identified as a root cause indicated by Overall Equipment Effectiveness (OEE) at 50.3% used since the 1980s. According to Total Productive Maintenance (TPM), this study proposes three alternative business solutions (autonomous maintenance, quality maintenance, and machine replacement). By considering the results of OEE and Analytical Hierarchy Process (AHP) with three criteria (cost, benefit, and implementation), the problem-solution proposes two approaches, namely conducting the autonomous maintenance with an improvement of OEE about 7% for the short term period and organizing the machine replacement with a significant OEE improvement about 17.1%.


Keywords


Aircraft; Manufacturing; Maintenance

Full Text:

PDF

References


Ahuja, I. P. S., & Khamba, J. S. (2008). Total productive maintenance: Literature review and directions. International Journal of Quality and Reliability Management, 25(7), 709–756. https://doi.org/10.1108/02656710810890890

Andriyadi, C., Atmaji, F. T. D., & Athari, N. (2016). Penentuan Optimasi Sistem Perawatan Dengan Menggunakan Metode Overall Equipment Effectiveness (oee) Dan Life Cycle Cost (lcc) Pada Mesin Cincinnati Milacron F Di Pt Dirgantara Indonesia. EProceedings of Engineering, 3(2).

Astuti, M. (2016). ANALISA TOTAL PRODUCTIVE MAINTENANCE MESIN CINCINNATI DI PT. DIRGANTARA INDONESIA. In Conference SENATIK STT Adisutjipto Yogyakarta, 25–31.

Elevli, S., & Elevli, B. (2010). Performance measurement of mining equipments by utilizing OEE. Acta Montanistica Slovaca, 15(2), 95.

Etikan, I., Musa, S. A., & Alkassim, R. S. (2016). Comparison of convenience sampling and purposive sampling. American Journal of Theoretical and Applied Statistics, 5(1), 1–4.

Forman, E. H., & Gass, S. I. (2001). The analytic hierarchy process—an exposition. Operations Research, 49(4), 469–486.

Gracecia, S. A., Lubis, M. Y., & Juliani, W. (2018). Usulan Perbaikan Pada Stasiun Kerja Cnc Profiling Machine Dgal Produk A380 Dengan Metode Six Sigma Di Pt. Xyz. EProceedings of Engineering, 5(3).

Haddad, T. H., & Jaaron, A. A. (2012). The applicability of total productive maintenance for healthcare facilities: an implementation methodology. International Journal of Business, Humanities and Technology, 2(2), 148–155.

Ilyasa, M. A. R., Bernik, M., & Harsanto, B. (2016). Implementation of Six Sigma Method in Small and Medium Enterprises (SMEs) (Case Study on CV. Berkah Abadi). Jurnal Bisnis & Manajemen, 17(1), 3–12.

Kennedy, R. (2006). Examining the Process of RCM and TPM : What do they ultimately achieve and are the two approaches compatible?

Kuswardani, S. Z., Atmaji, F. T. D., & Athari, N. (2016). Pengembangan Kebijakan Preventive Maintenance Mesin Cincinnati Milacron Dengan Menggunakan Metode Reliability Centered Maintenance (rcm) Dan Risk Matrix Di Pt Dirgantara Indonesia. EProceedings of Engineering, 3(2).

Mahmood, W. H., & Abdullah, I. (2008). FUGUAI MAPPING: THE USEFUL METHOD FOR PROBLEM SOLVING.

Mahmood, W. H. W., & Ab Rahman Mahmood, I. A. (2008). Autonomous Maintenance Program For Job Base In Technical University.

Rasindyo, M. R., Leksananto, K., & Helianty, Y. (2015). Analisis Kebijakan Perawatan Mesin Cincinnati Dengan Menggunakan Metode Reliability Centered Maintenance Di Pt. Dirgantara Indonesia. REKA INTEGRA, 3(1).

Saaty, T. L. (2008). Decision making with the analytic hierarchy process. International Journal of Services Sciences, 1(1), 83–98.

Sekaran, U., & Bougie, R. (2016). Research methods for business: A skill building approach. John Wiley & Sons.

Sulanjari, P., & Firman, A. (2012). EFFECTIVE IMPLEMENTATION OF LEAN MANUFACTURING IN PT. KALBE FARMA TBK. THE INDONESIAN JOURNAL OF BUSINESS ADMINISTRATION, 23–27.

Vardhan, S., Gupta, P., & Gangwar, V. (2015). The impact of Quality Maintenance Pillar of TPM on manufacturing performance. 2015 International Conference on Industrial Engineering and Operations Management (IEOM), 1–6. IEEE.

Venkatesh, J. (2007). An Introduction to Total Productive Maintenance (TPM).

Vijayakumar, S. R., & Gajendran, S. (2014). Improvement of overall equipment effectiveness (OEE) in injection moulding process industry. IOSR J Mech Civil Eng, 47–60.




DOI: http://dx.doi.org/10.24198/jbm.v21i1.280

Refbacks



Copyright (c) 2020 Jurnal Bisnis dan Manajemen

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.